GALAXY MACAU

CLIENT
Galaxy Entertainment Group
ARCHITECT
INTERIOR DESIGNER
LIGHTING DESIGNER
Laser Vision
SCOPE OF WORK
Exterior lighting, Indoor lighting, Integrated lighting
YEAR OF COMPLETION
Ongoing
LOCATION
Macau

Creative Lighting Asia became an integral part of the project lighting team from Phase 1 “renovation works”, being appointed to replace the original roof crown lighting scheme; with various dynamic Philips Color Kinetics color changing systems; that connected with the new show lighting control, lasers, and searchlights. In demonstrating technical expertise, technology capabilities, CLA’s Project Management, and Philips Color Kinetics Head of Engineering came together to provide the appropriate solution in light colour; maintaining the desired lighting effect and performance, yet with the added bonus of control flexibility.

No items found.

Ensuring the design intent remained, CLA undertook the role and scope of, system design, supply and installation. Having successfully completed Phase I, Phase II an extension came along, and the identical lighting system, team and installation was applied.

As Phase II evolved, so did the expansion of the lighting renovation, where the existing, aging, lower facade High Pressure Sodium floodlights were replaced, with a color matching LED solution.  

Ensuring the design intent remained, CLA undertook the role and scope of, system design, supply and installation. Having successfully completed Phase I, Phase II an extension came along, and the identical lighting system, team and installation was applied.

As Phase II evolved, so did the expansion of the lighting renovation, where the existing, aging, lower facade High Pressure Sodium floodlights were replaced, with a color matching LED solution.  

Ensuring the design intent remained, CLA undertook the role and scope of, system design, supply and installation. Having successfully completed Phase I, Phase II an extension came along, and the identical lighting system, team and installation was applied.

As Phase II evolved, so did the expansion of the lighting renovation, where the existing, aging, lower facade High Pressure Sodium floodlights were replaced, with a color matching LED solution.  

As Phase II evolved, so did the expansion of the lighting renovation, where the existing, aging, lower facade High Pressure Sodium floodlights were replaced, with a color matching LED solution.  

Ensuring the design intent remained, CLA undertook the role and scope of, system design, supply and installation. Having successfully completed Phase I, Phase II an extension came along, and the identical lighting system, team and installation was applied.

Ensuring the design intent remained, CLA undertook the role and scope of, system design, supply and installation. Having successfully completed Phase I, Phase II an extension came along, and the identical lighting system, team and installation was applied.

As Phase II evolved, so did the expansion of the lighting renovation, where the existing, aging, lower facade High Pressure Sodium floodlights were replaced, with a color matching LED solution.  

Ensuring the design intent remained, CLA undertook the role and scope of, system design, supply and installation. Having successfully completed Phase I, Phase II an extension came along, and the identical lighting system, team and installation was applied.

As Phase II evolved, so did the expansion of the lighting renovation, where the existing, aging, lower facade High Pressure Sodium floodlights were replaced, with a color matching LED solution.  

Ensuring the design intent remained, CLA undertook the role and scope of, system design, supply and installation. Having successfully completed Phase I, Phase II an extension came along, and the identical lighting system, team and installation was applied.

As Phase II evolved, so did the expansion of the lighting renovation, where the existing, aging, lower facade High Pressure Sodium floodlights were replaced, with a color matching LED solution.  

Ensuring the design intent remained, CLA undertook the role and scope of, system design, supply and installation. Having successfully completed Phase I, Phase II an extension came along, and the identical lighting system, team and installation was applied.

As Phase II evolved, so did the expansion of the lighting renovation, where the existing, aging, lower facade High Pressure Sodium floodlights were replaced, with a color matching LED solution.  

Ensuring the design intent remained, CLA undertook the role and scope of, system design, supply and installation. Having successfully completed Phase I, Phase II an extension came along, and the identical lighting system, team and installation was applied.

As Phase II evolved, so did the expansion of the lighting renovation, where the existing, aging, lower facade High Pressure Sodium floodlights were replaced, with a color matching LED solution.  

Ensuring the design intent remained, CLA undertook the role and scope of, system design, supply and installation. Having successfully completed Phase I, Phase II an extension came along, and the identical lighting system, team and installation was applied.

As Phase II evolved, so did the expansion of the lighting renovation, where the existing, aging, lower facade High Pressure Sodium floodlights were replaced, with a color matching LED solution.  

Ensuring the design intent remained, CLA undertook the role and scope of, system design, supply and installation. Having successfully completed Phase I, Phase II an extension came along, and the identical lighting system, team and installation was applied.

As Phase II evolved, so did the expansion of the lighting renovation, where the existing, aging, lower facade High Pressure Sodium floodlights were replaced, with a color matching LED solution.  

THE LONDONER MACAO